Clarence Court, Houghton-Le-Spring

Civil Engineering

Civil Engineering

Clarence Court

 

BDN were appointed for the design and associated modelling for the replacement of a failed attenuation system. The site was subject to surface water discharge restrictions.

Development of the revised on-site drainage network was created using the installation of a 2000m³ concrete Carlow Attenuation Tank to restrict discharge to pre-development rates.